On 1st May 2023, the Chennai Metro Rail Limited (CMRL) unveiled the financial/price bids for the underground civil contract package UG-01/RT-01 (Madhavaram to Perambur) of Phase 2 corridors of the Chennai Metro Rail Project in Chennai.
According to the results of the financial bids opening, the consortium of Dineshchandra R. Agrawal Infracon Private Limited and Soma Construction emerged as the lowest bidder for the construction of five underground metro stations for Corridor 23 of the Chennai Metro Rail Project Phase 2.
The scope of work includes constructing the underground stations at Thapalpetti, Moolakadai, Sembiyam, Perambur Market, and Perambur Metro, as well as the Crossover at Sembiyam, and work other than Diaphragm wall of two underground stations at Madhavaram Milk Colony and Murari Hospital in connection with corridor 3 of Chennai Metro Rail Project Phase 2.
Biltrax Construction Data is tracking 24,000+ projects on their technology platform for their clients.
Get exclusive access to upcoming projects in India with actionable insights and gain a competitive advantage for your products in the Indian Construction Market.
Visit www.biltrax.com or email us at contact@biltrax.com to become a subscriber and generate leads.
Disclaimer: The information contained herein has been compiled or arrived at, based upon information obtained in good faith from sources believed to be reliable. All such information and opinions can be subject to change. The image featured in this article is for representation purposes only and does not in any way represent the project. If you wish the article to be removed or edited, please email editor@biltrax.com.