FMDA approves INR 2,600 Crore projects for water and drainage solutions

Riya Fernandes Jul 12, 2024 0

The Faridabad Metropolitan Development Authority (FMDA) approved development projects worth an estimated INR 2,600 Crore on Wednesday, July 10. They prioritized solving drinking water and drainage problems. 

Under this initiative, FMDA will construct 22 Ranney wells, 70 tube wells using reverse rotary technology, and 8 boosting stations. Furthermore, a network of subsidiary boosting stations will be constructed to bolster the main stations, and an extensive 500 Km pipeline will be laid. With this project’s execution, the water supply capacity will soar to 450 Megaliters per day (MLD). Once this major project is completed by 2028-2029, Faridabad will have 56 Ranney wells and 220 tube wells.

Also Read: UPDCC Song Dam Drinking Water Project, Dehradun, Uttarakhand

Additionally, FMDA greenlit an estimated INR 1289 Crore sewage system revamp to improve rainwater drainage. This includes repairing or replacing the main sewer and damaged pips along with the intersection of the stormwater drain.

Moreover, to ensure an uninterrupted water supply and improve groundwater levels, FMDA approved a project to develop water bodies along the Yamuna River, costing an estimated INR 17 Crore. This ambitious venture will significantly enhance Faridabad’s infrastructure and living conditions.


Biltrax Construction Data is tracking 31,000+ projects on their technology platform for their clients.

Get exclusive access to upcoming projects in India with actionable insights. Furthermore, gain a competitive advantage for your products in the Indian Construction Market.

Visit www.biltrax.com or email us at contact@biltrax.com to become a subscriber and generate leads.

Disclaimer: The information herein is based upon information obtained in good faith from sources believed to be reliable. All such information and opinions can be subject to change. Furthermore, the image featured in this article is for representation purposes only. It does not in any way represent the project. If you wish to remove or edit the article, please email editor@biltrax.com.

0

Leave a Reply

Your email address will not be published. Required fields are marked *