The Gujarat Chief Minister Bhupendra Patel has approved an estimated 381.16 INR-Crore for developing a high-speed corridor. This road will connect Vadodara to Ekta Nagar, a renowned global tourist destination.
The project includes constructing a 6-lane road from Vadodara NH-48 junction to Wuda Hadd, along with service roads on both sides. The remaining 2.5 Km from Wuda Hadd to Dabhoi will complete Phase-1 of the high-speed corridor. Additionally, the project will feature standard 4-way routing along the length.
Also Read: Construction Landscape of India’s Roads & Highways Sector in FY 2023-24: A Zone-wise Analysis – Part 1 of 3
The construction will also include two underpasses and two elevated corridors. Notably, the project will build a 6-lane vehicle underpass over Ratanpur Chowk and Thuwavi Junction. Furthermore, it will include a 4-lane elevated corridor in Kellanpur village and over Sinor Chowk.
The Chief Miniter’s approval for this high-speed corridor in Gujarat aims to enhance accessibility to the Statue of Unity. This development will not only save time and fuel but also stimulate tourism growth throughout the region.
Biltrax Construction Data is tracking 32,000+ projects on their technology platform for their clients.
Get exclusive access to upcoming projects in India with actionable insights. Furthermore, gain a competitive advantage for your products in the Indian Construction Market.
Visit www.biltrax.com or email us at contact@biltrax.com to become a subscriber and generate leads.
Disclaimer: The information herein is based upon information obtained in good faith from sources believed to be reliable. All such information and opinions can be subject to change. Furthermore, The image featured in this article is for representation purposes only. It does not in any way represent the project. If you wish to remove or edit the article, please email editor@biltrax.com.
Discover more from Biltrax Media, A Biltrax Group venture
Subscribe to get the latest posts sent to your email.