The Ministry of Defence granted the Lucknow Development Authority (LDA) around 21.81 Hectares of land in the cantonment area for the construction of a dam and a four-lane road under the Green Corridor Project. The estimated cost of the project is 7,000 INR-Crore.
The Green Corridor Project involves constructing a 5.8 Km long flood embankment (dam) along the right bank of Gomti. Of this, 2.8 Km will be located within the cantonment area. Furthermore, the new four-lane road and dam will alleviate traffic congestion while offering a permanent solution to waterlogging issues.
Also Read: Sitapur-Hanumana Micro Irrigation Project, Sihawal, Madhya Pradesh
The Green Corridor Project will link IIM Road to Shaheed Path. The first phase, connecting IIM to Pakka Pul, is completed. The second phase will extend from Daliganj to Samta Mulak, followed by the third phase, which will connect Pipra Ghat to Shaheed Path.
Biltrax Construction Data is tracking 33,000+ projects on their technology platform for their clients.
Get exclusive access to upcoming projects in India with actionable insights. Furthermore, gain a competitive advantage for your products in the Indian Construction Market.
Visit www.biltrax.com or email us at contact@biltrax.com to become a subscriber and generate leads.
Disclaimer: The information herein is based upon information obtained in good faith from sources believed to be reliable. All such information and opinions can be subject to change. Furthermore, The image featured in this article is for representation purposes only. It does not in any way represent the project. If you wish to remove or edit the article, please email editor@biltrax.com.
Discover more from Biltrax Media, A Biltrax Group venture
Subscribe to get the latest posts sent to your email.