National High-Speed Rail Corporation Limited (NHSRCL) has awarded L&T Construction a contract worth more than INR 7,000 crore for the Mumbai Ahmedabad high-speed rail project (MAHSR). With this Package, the company will be executing 92 percent of the main line between Shilphata and Ahmedabad.
The construction of the 135.45 km stretch MAHSR – C3 package, which includes viaducts, stations, major river bridges, depots, tunnels, earth structures, stations, and other auxiliary works, has been assigned to L&T Construction. With this last tender, NHSRCL has awarded all civil contracts for the Mumbai-Ahmedabad High-Speed Rail corridor.
The MAHSR Bullet Train project, covering approximately 508 km, will span 155.76 km in Maharashtra, 4.3 km in Dadra & Nagar Haveli, and 348.04 km in Gujarat. Along the route, there will be 12 stations for the high-speed train. NHSRCL has stated that the first phase of the bullet train project is set to launch in 2026.
Biltrax Construction Data is tracking 25,000+ projects on their technology platform for their clients.
Get exclusive access to upcoming projects in India with actionable insights and gain a competitive advantage for your products in the Indian Construction Market.
Visit www.biltrax.com or email us at contact@biltrax.com to become a subscriber and generate leads.
Disclaimer: The information contained herein has been compiled or arrived at, based upon information obtained in good faith from sources believed to be reliable. All such information and opinions can be subject to change. The image featured in this article is for representation purposes only and does not in any way represent the project. If you wish the article to be removed or edited, please email editor@biltrax.com.
Discover more from Biltrax Media, A Biltrax Group venture
Subscribe to get the latest posts sent to your email.