Larsen & Toubro, a major player in engineering and construction, emerged as the lowest bidder for designing and constructing the proposed Hyderabad Airport Express Metro Line project on Monday, August 14.
The airport metro, spanning 31 kilometers and linking Raidurg to GMR Hyderabad International Airport, will consist of an elevated stretch measuring 29.3 kilometers and a 1.7-kilometer underground section situated near the airport terminal, which will accommodate an underground metro station.
Commencement of construction is anticipated in September, and the project completion is slated for a 36-month timeline. While the Hyderabad Metro rail project was established through a public-private partnership involving L&T, Hyderabad Metro Rail Ltd., and was executed using the design, build, finance, operate, and transfer model, the funding for the airport metro is being provided by the Telangana government.
Biltrax Construction Data is tracking 25,000+ projects on their technology platform for their clients.
Get exclusive access to upcoming projects in India with actionable insights and gain a competitive advantage for your products in the Indian Construction Market.
Visit www.biltrax.com or email us at contact@biltrax.com to become a subscriber and generate leads.
Disclaimer: The information contained herein has been compiled or arrived at, based upon information obtained in good faith from sources believed to be reliable. All such information and opinions can be subject to change. The image featured in this article is for representation purposes only and does not in any way represent the project. If you wish the article to be removed or edited, please email editor@biltrax.com.
Discover more from Biltrax Media, A Biltrax Group venture
Subscribe to get the latest posts sent to your email.