Larsen & Toubro (L&T) and Megha Engineering & Infrastructures (MEIL) have emerged as the lowest bidders for the construction of two civil packages for the Thane-Borivali twin tunnel project in Mumbai.
The Mumbai Metropolitan Region Development Authority (MMRDA) had issued tenders for the civil construction of the project last year. The project aims to create an east-west corridor for traffic movement, connecting Mulund in the eastern suburbs with Goregaon in the western suburbs, as there is currently no direct connectivity between these areas.
The proposed project includes the construction of 10.8 km of twin tunnels and an additional km of approach roads on both ends. Three-lane tunnels will connect Magathane’s Ekta Nagar in Borivali and Tikuji-NiWadi in Thane.
Currently, the travel time between Borivali and Thane takes more than an hour. However, the proposed 11.84 km-long tunnel project is expected to reduce the travel time to around 15 minutes. The project, which is estimated to cost INR 13,200 crore, is scheduled to be completed in five years.
Biltrax Construction Data is tracking 23,000+ projects on their technology platform for their clients.
Get exclusive access to upcoming projects in India with actionable insights and gain a competitive advantage for your products in the Indian Construction Market.
Visit www.biltrax.com or email us at contact@biltrax.com to become a subscriber and generate leads.
Disclaimer: The information contained herein has been compiled or arrived at, based upon information obtained in good faith from sources believed to be reliable. All such information and opinions can be subject to change. The image featured in this article is for representation purposes only and does not in any way represent the project. If you wish the article to be removed or edited, please email editor@biltrax.com.
Discover more from Biltrax Media, A Biltrax Group venture
Subscribe to get the latest posts sent to your email.