Mumbai Metropolitan Region Development Authority (MMRDA) has floated a tender worth 506 INR-Crore to construct a Depot (car shade) in Kanjurmarg. The proposed depot is a part of the 15.31 km long Metro line 6.
Sanjay Mukherjee, Metropolitan Commissioner, on Thursday, October 12, announced that the depot (spanning across 15 Hectares) will include primary facilities, such as 18 stabling lines, an auxiliary Substation, an automatic train washing facility, an OCC, staff quarters, a maintenance line, and a workshop.
Also Read: Mapletree India is developing a Commercial Complex in Vikhroli, Mumbai
The construction of the Kanjurmarg depot is expected to be completed in 30 months once the contractor receives the letter of intent.
The proposed Metro Line 6 runs through Swami Samarth Nagar (Andheri) and Vikhroli. The construction of the metro line is 70% completed and is fully-funded by the National Development Bank (NDB). The metro work is anticipated to be completed by November/ December 2024, but the deadline can extend due to depot construction.
Biltrax Construction Data is tracking 26,000+ projects on their technology platform for their clients.
Get exclusive access to upcoming projects in India with actionable insights and gain a competitive advantage for your products in the Indian Construction Market.
Visit www.biltrax.com or email us at contact@biltrax.com to become a subscriber and generate leads.
Disclaimer: The information contained herein has been compiled or arrived at, based upon information obtained in good faith from sources believed to be reliable. All such information and opinions can be subject to change. The image featured in this article is for representation purposes only and does not in any way represent the project. If you wish the article to be removed or edited, please email editor@biltrax.com.
Discover more from Biltrax Media, A Biltrax Group venture
Subscribe to get the latest posts sent to your email.