The East Coast Railway has issued a tender to appoint a Consultant Architect for Railway Station Redevelopment Projects in Odisha. This Architect will provide Architectural and Technical Consultancy for carrying out Feasibility Studies, Master Planning, Urban Designing, and Engineering. They will also prepare Detailed Project Reports (DPRs) for the integrated redevelopment of Khurda Road, Brahmapur, Bhadrak, Jajpur-Keonjhar Road, Rayagada and Sambalpur railway station. Issued on 4th June 2022, the tender is due till 27th June 2022. They will evaluate the submitted bids on 27th June 2022.
The proposed Railway Station Redevelopment projects are in the pre-construction stage. With the estimated cost of INR 100 crores, the construction area will range from 300,000 to 500,000 sq. ft.
Sambalpur Railway Junction
The railway junction in Sambalpur, Orissa has a latitude and longitude of 21.483374 (21° 29′ 0.1464″N) and 83.961553 (83°57′ 41.5902″E). The construction area of the proposed project is between 3,00,000–5,00,000 sq. ft. Construction will commence in 2022 and is expected to finish by 2025. The estimated project cost is approximately INR 100 crores.
Name of the Station | Sambalpur Railway Junction |
Latitude and Longitude | 21.483374(21°29’0.1464″N),83.961553 (83°57′ 41.5902″E) |
Pin code | 768003 |
Year of Commencement of Construction | 2022 |
Year of Completion of Construction | 2025 |
Construction Area Range (in sq. ft) | 3,00,000 to 5,00,000 sq. ft |
Total Project Cost | INR 100 crores |
Earnest Money Deposit (EMD – INR) | INR 141,800 |
Ganjam Railway Station
The railway station at Ganjam, also known as Brahmapur railway station, is the second station after Sambalpur and has the latitude and longitude of 19.296226 (19° 17′ 46.4136″N) and 84.79777 (84° 47′ 51.9714″E). The construction area of the proposed project is between 3,00,000–5,00,000 sq. ft. Construction will commence in 2022 and is expected to finish by 2025. The estimated project cost is approximately INR 100 crores.
Name of the Station | Ganjam Railway Station |
Latitude and Longitude | 19.296226 (19° 17′ 46.4136″N), 84.79777 (84° 47′ 51.9714″E) |
Pin code | 760005 |
Year of Commencement of Construction | 2022 |
Year of Completion of Construction | 2025 |
Construction Area Range (in sq. ft) | 3,00,000 to 5,00,000 sq. ft |
Total Project Cost | INR 100 crores |
Earnest Money Deposit (EMD – INR) | INR 71,300 |
Khurda Road Railway Station
At Khorda, the Khurda Road railway station has the latitude and longitude of 20.152822 (20° 9′ 10.1592″N) and 85.708509 (85° 42′ 30.6324″E). The construction area of the proposed project is between 3,00,000–5,00,000 sq. ft. Construction will commence in 2022 and is expected to finish by 2025. The estimated project cost is approximately INR 100 crores.
Name of the Station | Khurda Road Railway Station |
Latitude and Longitude | 20.152822(20°9’10.1592″N)and 85.708509 (85° 42′ 30.6324″E) |
Pin code | 752050 |
Year of Commencement | 2022 |
Year of Completion | 2025 |
Construction Area Range (in sq. ft) | 3,00,000 to 5,00,000 sq. ft |
Total Project Cost | INR 100 crores |
Earnest Money Deposit (EMD – INR) | INR 98,000 |
Rayagada Railway Station
At Rayagada, the Rayagada railway station has the latitude and longitude of 19.175632 (19° 10′ 32.2752″N) and 83.410589 (83° 24′ 38.1204″E). The construction area of the proposed project is between 3,00,000–5,00,000 sq. ft. Construction will commence in 2023 and is expected to finish by 2026. The estimated project cost is approximately INR 100 crores.
Name of the Station | Rayagada Railway Station |
Latitude and Longitude | 19.175632 (19° 10′ 32.2752″N), 83.410589 (83° 24′ 38.1204″E) |
Pin code | 765001 |
Year of Commencement | 2023 |
Year of Completion | 2026 |
Construction Area Range (in sq. ft) | 3,00,000 to 5,00,000 sq. ft |
Total Project Cost | INR 100 crores |
Earnest Money Deposit (EMD – INR) | INR 92,100 |
Designed to create an efficient way of transport, the project proposal states the importance of ‘fluidity’ to disperse and handle passengers across the 4 stations.
Name of the Project | Railway Station Redevelopment Projects at Orissa |
Name of the Developer | East Coast Railway |
Names of the Stations | Sambalpur Railway Junction, Ganjam Railway Station, Khurda Road Railway Station, Rayagada Railway Station |
Tender Issue Date | June 4, 2022 |
Tender Due Date | June 27, 2022 |
Form Issue End Date | June 27, 2022 |
Tender Opening Date | June 27, 2022 |
Tender Evaluation Date | June 27, 2022 |
Tender Link | https://ireps.gov.in/ |
Building Use | Transport Infrastructure |
Project Category | Redevelopment, Railway Station |
Issuer Name | East Coast Railway |
Role | Consultant Architect |
Specialisation | The Architect will be responsible for providing architectural and technical consultancy, for carrying out feasibility studies, master planning, urban designing, engineering and also be responsible for the preparation of Detailed Project Reports (DPRs). |
Estimated Value Range (In INR) | Up to INR 5 Crores |
Total Earnest Money Deposit (EMD – INR) | INR 3,08,500 |
East Coast Railway
One of the blue chip zones of Indian Railways came into existence in its present form w.e.f. 1st April 2003. Since then, the new zonal railway headquarters has been functioning at Bhubaneswar, the capital city in the state of Orissa. Extended over three states, the geographical jurisdiction of the East Coast Railway encompasses almost all the parts of Orissa along with parts of Srikakulam, Vizianagaram & Visakhapatnam districts of North Eastern Andhra Pradesh, and Bastar & Dantewada districts of Chhattisgarh State. These regions with a long coastal line are rich in minerals and other natural resources, and are on the threshold of an industrial upsurge.
Biltrax Construction Data is tracking 20000+ projects on their technology platform for their Clients. Visit https://www.biltrax.com/ or email us at contact@biltrax.com to become a subscriber and generate new leads.
Disclaimer: The information contained herein have been compiled or arrived at, based upon information obtained in good faith from sources believed to be reliable. All such information and opinions can be subject to change. The image featured in this article is only for illustration purposes and does not in anyway represent the project. If you wish the article to be removed or edited, please send an email to editor@biltrax.com