The Railways has approved an estimated 509 INR-Crore for two major flyover projects in Odisha’s Cuttack and Rayagada districts. This initiative aims to improve operational efficiency and reduce traffic congestion on critical railway routes.
In Cuttack, a 10.89 Km flyover project will connect Rajathgarh, Radhakishorepur, and Machhapur stations. This flyover, costing an estimated 268.92 INR-Crore, will enable simultaneous train movements. By minimizing delays from cross-traffic at busy junctions, the project will enhance network efficiency. Additionally, the Railway Board has sanctioned 240 INR-Crore for the Raipur-Vizianagaram line under East Coast Railway’s Waltair division.
Also Read: Navigating Building Construction Trends in India’s North Zone: FY 2023-24
The highlight of this project is a 5.5 Km railway flyover designed to streamline traffic on this vital route. This flyover will allow seamless train merging with the loop line at Singapur Road, facilitating smoother and uninterrupted operations. Furthermore, these flyover projects are aimed at expanding traffic capacity and eliminating bottlenecks at the Khurda Road and Waltair divisions.
Biltrax Construction Data is tracking 33,000+ projects on their technology platform for their clients.
Get exclusive access to upcoming projects in India with actionable insights. Furthermore, gain a competitive advantage for your products in the Indian Construction Market.
Visit www.biltrax.com or email us at contact@biltrax.com to become a subscriber and generate leads.
Disclaimer: The information herein is based upon information obtained in good faith from sources believed to be reliable. All such information and opinions can be subject to change. Furthermore, The image featured in this article is for representation purposes only. It does not in any way represent the project. If you wish to remove or edit the article, please email editor@biltrax.com.
Discover more from Biltrax Media, A Biltrax Group venture
Subscribe to get the latest posts sent to your email.