Rail Vikas Nigam Limited (RVNL) has floated the tender for Package – III C allied works related to constructing the Yavatmal-Nanded new BG line of Central Railway, Maharashtra. The estimated construction cost of the project is 409.34 INR-Crore with 02 INR-Crore EMD (Earnest Money Deposit).
The bidding submission opens from November 15 to November 21, and the project is anticipated to be completed within 30 months of commencement. The scope of work involves the construction of – roadbeds, major bridges, minor bridges, RUBs, and ROBs, including road approaches, station buildings, staff quarters, other service buildings, COPs, FOBs, HL Platforms, general electrical work, and other works.
Also Read: Top 10 Railway Projects in India
RVNL aims for the socio-economic development of the region along with employment generation and freight goods transportation through this project.
Biltrax Construction Data is tracking 26,000+ projects on their technology platform for their clients.
Get exclusive access to upcoming projects in India with actionable insights and gain a competitive advantage for your products in the Indian Construction Market.
Visit www.biltrax.com or email us at contact@biltrax.com to become a subscriber and generate leads.
Disclaimer: The information contained herein has been compiled or arrived at, based upon information obtained in good faith from sources believed to be reliable. All such information and opinions can be subject to change. The image featured in this article is for representation purposes only and does not in any way represent the project. If you wish the article to be removed or edited, please email editor@biltrax.com.