Tamil Nadu Newsprint and Papers (TNPL) plans to invest 607 INR Crore on projects including energy efficiency improvements. The project involves the Revamping of Steam and Power Systems (RSPS), a 2 MW rooftop solar array, and a 500 M3 wastewater treatment facility.
The estimated deadline for the project is 2025. A capital outlay of 520 INR-Crore is expected for the same. Out of this, 100 INR crore will be spent this year.
Also Read: Sacred Geometries: Ancient Architecture & Symbology Are Steeped Into The New Hotel In Bodh Gaya
RSPS involves the installation of 2 high-pressure boilers for utilities like steam and power for mill operations. The project also includes the installation of a 2 MW floating solar array. The wastewater treatment facility, with a capacity of 500 M3/ day, will be installed to treat and reuse the wastewater internally. The estimated cost for this project is 75 INR crore.
Furthermore, TNPL is exploring new segments to integrate into value-added products using paper and boards as raw materials and is in active discussions with paper machine manufacturers.
Biltrax Construction Data is tracking 26,000+ projects on their technology platform for their clients.
Get exclusive access to upcoming projects in India with actionable insights and gain a competitive advantage for your products in the Indian Construction Market.
Visit www.biltrax.com or email us at contact@biltrax.com to become a subscriber and generate leads.
Disclaimer: The information contained herein has been compiled or arrived at, based upon information obtained in good faith from sources believed to be reliable. All such information and opinions can be subject to change. The image featured in this article is for representation purposes only and does not in any way represent the project. If you wish the article to be removed or edited, please email editor@biltrax.com.
Discover more from Biltrax Media, A Biltrax Group venture
Subscribe to get the latest posts sent to your email.