Work to construct flyover at Thoraipakkam on OMR begins

Unnati More Jan 15, 2024 0

Chennai Metro Rail Corporation (CMRL) has begun construction work on Rajiv Gandhi Salai’s first flyover (commonly known as OMR) at Thoraipakkam Junction. CMRL is currently working on the construction of piles on the extension of Thoraipakkam – Pallavaram Radial Road, with 15 piles already completed.

Tamil Nadu Road Development Company (TNRDC) is overseeing the development of this project which includes the construction of four flyovers in an integrated manner with respective elevated lines. The estimated cost of this project is INR 459.32 Crore, with INR 331 Crore sanctioned by TNRDC and the remaining amount to be sanctioned by CMRL.

Also Read: Chenab Bridge to Agra Metro | PM Modi to inaugurate 5 Major Infra Projects before 2024 elections

OMR is a part of Corridor 3 of the 116km-long Chennai Metro Rail’s Phase II, which connects Madhavaram and SIPCOT through Ayanavaram, Perambur, Thousand Lights, Royapettah, Thirumayilai, Adyar, Indira Nagar, Tiruvanmiyur, Taramani, Perungudi and Thoraipakkam. It is planned as an underground stretch from Madhavaram to Taramani and continues as an elevated corridor till SIPCOT.

The flyover will be developed at the first level, elevated at a height of 6m from the ground, whereas the Chennai Metro Rail Line will be at the second level, elevated at 18m from the ground. The authorities also announced that contracts for the work would be awarded shortly.


Biltrax Construction Data is tracking 28,000+ projects on their technology platform for their clients.

Get exclusive access to upcoming projects in India with actionable insights and gain a competitive advantage for your products in the Indian Construction Market.

Visit www.biltrax.com or email us at contact@biltrax.com to become a subscriber and generate leads.

Disclaimer: The information contained herein has been compiled or arrived at, based upon information obtained in good faith from sources believed to be reliable. All such information and opinions can be subject to change. The image featured in this article is for representation purposes only and does not in any way represent the project. If you wish the article to be removed or edited, please email editor@biltrax.com.

0

Leave a Reply

Your email address will not be published. Required fields are marked *