THDC India’s 1200 MW pumped storage plant gets approval

Riya Fernandes Jul 29, 2024 0

The Uttar Pradesh Government has granted in-principle approval for THDC India’s 1200 MW (megawatt) pumped storage power plant project in the Robertsganj tehsil of Sonbhadra district. The project’s estimated cost is INR 6,600 Crore

The upcoming off-stream closed-loop pump storage plant requires approximately 300.55 Hectares of land. Additionally, the project’s operation will need an initial reservoir filling of 15.031 Million Cubic Meters (MCM) of water annually. The Son River will be the source of water supply for THDC India’s venture.

Also Read: Top 10 power companies in India

THDC India’s upcoming pumped storage plant project will generate electricity for 6 hours and 36 minutes daily. It further represents a major advancement in Uttar Pradesh’s power infrastructure, highlighting the state’s dedication to sustainable energy solutions. With THDC India, a key player in the energy sector, leading the initiative, the project is set to reinforce the state’s commitment to clean and efficient energy.


Biltrax Construction Data is tracking 31,000+ projects on their technology platform for their clients.

Get exclusive access to upcoming projects in India with actionable insights. Furthermore, gain a competitive advantage for your products in the Indian Construction Market.

Visit www.biltrax.com or email us at contact@biltrax.com to become a subscriber and generate leads.

Disclaimer: The information herein is based upon information obtained in good faith from sources believed to be reliable. All such information and opinions can be subject to change. Furthermore, The image featured in this article is for representation purposes only. It does not in any way represent the project. If you wish to remove or edit the article, please email editor@biltrax.com.

0

Leave a Reply

Your email address will not be published. Required fields are marked *