Assam: construction work of Longest Flyover Begins, set to be completed by 2026

Unnati More Nov 29, 2023 0

The CM of Assam, Himanta Biswa Sarma, on November 26, announced the construction work for Assam’s longest flyover has begun and is projected to be completed by 2026. The project aims to alleviate traffic and ease connectivity in the area.

The six-km-long flyover will connect Dighalipukhuri to Bamunimaidan on the Maniram Dewan Road (in Guwahati) at an estimated cost of 888 INR Crore.

Also Read: Nitin Gadkari announces sanction of INR 1338.61 Crore for NH-17 expansion in Assam

The CM had also inaugurated a few key flyovers in the state that have already demonstrated their crucial role in alleviating traffic challenges. These include:

  • Shraddhanjali Flyover over Zoo Road in Guwahati on October 18, 2023, coinciding with the auspicious Maha Panchami.
  • Nilachal Flyover in Maligaon on August 30, 2023.
  • Arya Nagar Flyover, in October 2022, with an estimated cost of 149.07 INR crore and spanning 790 meters.

Biltrax Construction Data is tracking 27,000+ projects on their technology platform for their clients.

Get exclusive access to upcoming projects in India with actionable insights and gain a competitive advantage for your products in the Indian Construction Market.

Visit www.biltrax.com or email us at contact@biltrax.com to become a subscriber and generate leads.

Disclaimer: The information contained herein has been compiled or arrived at, based upon information obtained in good faith from sources believed to be reliable. All such information and opinions can be subject to change. The image featured in this article is for representation purposes only and does not in any way represent the project. If you wish the article to be removed or edited, please email editor@biltrax.com.

0

Leave a Reply

Your email address will not be published.