On Friday, 30 June 2023, Prime Minister Narendra Modi laid the foundation stone for three new buildings at Delhi University in the varsity’s North Campus. These buildings include the faculty of technology, a computer center, and an academic block.
The completion of these buildings is anticipated at different junctures in 2024. The faculty of technology, which will have a ground floor and seven floors, is expected to be completed by November 2024 with a project cost of INR 195.65 Crore.
Similarly, the academic block in Maurice Nagar, costing INR 329.3 Crore, is scheduled for completion by November 2024. Additionally, the computer center, with an estimated cost of INR 87.29 Crores, is projected to be ready by May 2024.
Biltrax Construction Data is tracking 25,000+ projects on their technology platform for their clients.
Get exclusive access to upcoming projects in India with actionable insights and gain a competitive advantage for your products in the Indian Construction Market.
Visit www.biltrax.com or email us at contact@biltrax.com to become a subscriber and generate leads.
Disclaimer: The information contained herein has been compiled or arrived at, based upon information obtained in good faith from sources believed to be reliable. All such information and opinions can be subject to change. The image featured in this article is for representation purposes only and does not in any way represent the project. If you wish the article to be removed or edited, please email editor@biltrax.com.
Discover more from Biltrax Media, A Biltrax Group venture
Subscribe to get the latest posts sent to your email.