Avaada Energy to Set up 400 MW Solar Project for GUVNL in Gujarat

Rutuja Kedare Jun 16, 2023 0

Avaada Energy, a subsidiary of Avaada Group received a Letter of Intent (LoI) to establish a 400 MW (DC) solar project from Gujarat Urja Vikas Nigam Limited (GUVNL).

Avaada Energy secured 200 MW as the base capacity, with a tariff of INR 2.75/kWh, and an additional 200 MW through the green shoe option, at a tariff of INR 2.71/kWh, from GUVNL. 

This project has the potential to supply clean energy to around 500,000 households. According to the bid terms, Avaada Energy will supply the solar power generated from the project to GUVNL for 25 years. The projects are expected to be commissioned within 18 months from the execution date of the Power Purchase Agreements (PPAs).


Biltrax Construction Data is tracking 25,000+ projects on their technology platform for their clients.

Get exclusive access to upcoming projects in India with actionable insights and gain a competitive advantage for your products in the Indian Construction Market.

Visit www.biltrax.com or email us at contact@biltrax.com to become a subscriber and generate leads.

Disclaimer: The information contained herein has been compiled or arrived at, based upon information obtained in good faith from sources believed to be reliable. All such information and opinions can be subject to change. The image featured in this article is for representation purposes only and does not in any way represent the project. If you wish the article to be removed or edited, please email editor@biltrax.com.

0

Leave a Reply

Your email address will not be published.