CIDCO invites tenders for Kharghar-Belapur Coastal Road Project

Riya Fernandes Sep 16, 2024 0

The City and Industrial Development Corporation (CIDCO) commenced the process of designing and constructing the Kharghar Coastal Road (KCR). This road will connect Jalmarg Sector 16 in Kharghar to Belapur. 

The Kharghar Coastal Road project spans approximately 9.679 Km, of which 2.986 Km is part of an existing road. The new road will feature stilt construction and ground-level reclamation, providing better connectivity between key points in Navi Mumbai. The road will stretch from Jalmarg Sector 16 in Kharghar to the PMAY Housing Scheme near Kharghar railway station. It will then extend to the underpass near Delhi Public School (DPS) in Nerul. Further, it will link Kharghar station to Belapur, running parallel to the upcoming Navi Mumbai International Airport (NMIA).

Also Read: Top Upcoming Highway Projects by MSRDC

The Kharghar Coastal Road project will be completed within 30 months. Furthermore, this venture is aimed at improving access to NMIA. An expected 913-day timeline is set, with 90 days assigned to design and approvals, and 823 days to construction and handover.


Biltrax Construction Data is tracking 32,000+ projects on their technology platform for their clients.

Get exclusive access to upcoming projects in India with actionable insights. Furthermore, gain a competitive advantage for your products in the Indian Construction Market.

Visit www.biltrax.com or email us at contact@biltrax.com to become a subscriber and generate leads.

Disclaimer: The information herein is based upon information obtained in good faith from sources believed to be reliable. All such information and opinions can be subject to change. Furthermore, The image featured in this article is for representation purposes onlyIt does not in any way represent the project. If you wish to remove or edit the article, please email editor@biltrax.com.

0

Leave a Reply

Your email address will not be published. Required fields are marked *