The Mumbai Metro Line 7A (Andheri – CSIA) is currently under construction. An extension of the Mumbai Metro Line 7 (Andheri East to Dahisar East), the Mumbai Metropolitan Region Development Authority (MMRDA) is developing this project. The proposed line is 3.175 Km long and will have two metro stations. These are the elevated Andheri East metro station and the underground Chhatrapati Shivaji International Airport (CSIA) metro station. The total project construction cost is INR 1,000 crores and the project completion date is 2023. J. Kumar Infraprojects Limited started the piling work inside the AAI colony for the ramp, tunnelling 2.9 km to CSIA, as of April 2022.
Mumbai Metro Line 7A – Key Project Highlights
Name of the Project | Mumbai Metro Line 7A (Andheri – CSIA) |
Latest Status | Under Construction |
Developer | Mumbai Metropolitan Region Development Authority (MMRDA) |
Location | Mumbai, Maharashtra |
Region | Mumbai Metropolitan Region (MMR) |
Construction Cost (in INR) | INR 1000 crores |
Building Use | Transportation Infrastructure |
Category | Metro Station |
Sector | Public |
Project Start Date | 2020 |
Project Completion Date | 2023 |
Mumbai Metropolitan Region Development Authority (MMRDA)
The Mumbai Metropolitan Region Development Authority (MMRDA) was established under the Mumbai Metropolitan Development Act, 1974, on 26th January 1975. Since its inception, MMRDA has engaged in long-term planning, promotion of new growth centres, implementation of strategic projects and financing infrastructure development. The aim of establishing MMRDA was to make MMR a destination for economic activity by promoting infrastructure development and improving the quality of life. Currently, it is the owner-developer of the project.
J Kumar Infraprojects Limited
J. Kumar Infraprojects Limited remain true to their mantra for superlative infrastructure, i.e., Dream Big & Work Harder. Their services include transportation engineering, civil construction, irrigation, and piling. The company dedicates themselves to creating an infrastructure ecosystem, where quality and excellence is not an exception, but a norm. Currently, it is the civil works contractor for the project.
Systra MVA Consulting (I) Private Limited
Systra MVA Consulting (I) Private Limited in India is an international consulting and engineering company operating in the fields of Metros, High-Speed Rail, Railways, Roads, Buildings, Urban planning, and Water and Environment for public and private organisations. Currently, it is acting in consultancy capacity for the project.
Consulting Engineers Group Limited (CEG)
Consulting Engineers Group (CEG) is a marquee for its global, distinguished and integrated range of skills and expertise. It is a trusted name for delivering engineering excellence in infrastructure development. Currently, it is acting in consultancy capacity for the project.
Biltrax Construction Data is tracking 20000+ projects on their technology platform for their clients. Visit https:/www.biltrax.com/or email us at contact@biltrax.com to become a subscriber and generate new leads.Disclaimer: The information contained has been compiled or arrived at, based upon information got in good faith from sources believed to be reliable. All such information and opinions can be subject to change. The image featured in this article is for representation only and does not represent the project. To have the article removed or edited, please email editor@biltrax.com.