G R Infraprojects Ltd has secured the contract for Phase 2 of the Nagpur Metro Rail Project (NMRP), in Maharashtra worth an estimated 904 INR-Crore. The company announced it has emerged as the lowest bidder for the proposed metro project, on Monday, September 23.
The project, awarded by Maharashtra Metro Rail Corporation Ltd, involves the design and construction of a 17.62 Km elevated metro viaduct. Additionally, this includes railway spans of 79 M and 100 M in length. The project also includes the design and construction of a 6-lane double-decker portion with a vehicular underpass spanning 1.14 Km. This would be developed in reach-1A of NMRP Phase 2.
Also Read: Odisha’s Bhubaneswar Metro Rail Phase 1
The project will be developed in EPC (Engineering, Procurement, and Construction) mode and is expected to be completed within 30 months of commencement. The financial bid opening took place on Monday, September 23. Once completed, the NMRP will significantly enhance public transportation and improve connectivity in Nagpur.
Biltrax Construction Data is tracking 32,000+ projects on their technology platform for their clients.
Get exclusive access to upcoming projects in India with actionable insights. Furthermore, gain a competitive advantage for your products in the Indian Construction Market.
Visit www.biltrax.com or email us at contact@biltrax.com to become a subscriber and generate leads.
Disclaimer: The information herein is based upon information obtained in good faith from sources believed to be reliable. All such information as well as opinions can be subject to change. Furthermore, The image featured in this article is for representation purposes only. It does not in any way represent the project. If you wish to remove or edit the article, please email editor@biltrax.com.
Discover more from Biltrax Media, A Biltrax Group venture
Subscribe to get the latest posts sent to your email.