Vehicle Manufacturer JSW Green Mobility has been allotted an anticipated 636 Acres of land in AURIC city’s Bidkin node, Maharashtra. The company plans to set up a manufacturing unit with production expected to begin within 12 to 18 months. The Maharashtra Industrial Township Limited (MITL) issued the land allotment certificate online.
JSW Green Mobility will set up an electric car manufacturing unit on an anticipated 546 Acres of the allocated land. Meanwhile, the remaining 90 Acres will be used for producing commercial vehicles. Additionally, this ambitious project represents an estimated investment of 27,200 INR-Crore, expected to generate 5,000 direct and 15,000 indirect jobs.
Also Read: Asian Paints Vinyl Acetate Monomer Manufacturing Unit, Dahej
With work starting soon, JSW Green Mobility is poised to drive significant growth in India’s electric vehicle sector. Consequently, this will accelerate its production timeline and contribute to the region’s economic boom.
Biltrax Construction Data is tracking 33,000+ projects on their technology platform for their clients.
Get exclusive access to upcoming projects in India with actionable insights. Furthermore, gain a competitive advantage for your products in the Indian Construction Market.
Visit www.biltrax.com or email us at contact@biltrax.com to become a subscriber and generate leads.
Disclaimer: The information herein is based upon information obtained in good faith from sources believed to be reliable. All such information and opinions can be subject to change. Furthermore, the image featured in this article is for representation purposes only. It does not in any way represent the project. If you wish to remove or edit the article, please email editor@biltrax.com.