Assam CM Himanta Biswa Sarma announced that TATA Electronics has submitted a proposal for developing a semiconductor processing plant in Jagiroad, Assam. The company has proposed an investment of 40,000 INR crore for the processing plant.
The OSAT (Outsourced Semiconductor Assembly and Test) facility will be responsible for Assembling, Testing, Marking, and Packaging (ATMP) of the silicon chips. TATA is currently awaiting approval from the government of India for the same.
Also Read: Integrated Directorate Complex, Guwahati, Assam
TATA also plans to set up one of India’s largest iPhone assembly plants in Tamil Nadu. The facility will be located in Hosur and will include 20 assembly lines. It is anticipated to be operational within 12-18 months of commencement and will generate 50,000 new job opportunities.
Biltrax Construction Data is tracking 27,000+ projects on their technology platform for their clients.
Get exclusive access to upcoming projects in India with actionable insights and gain a competitive advantage for your products in the Indian Construction Market.
Visit www.biltrax.com or email us at contact@biltrax.com to become a subscriber and generate leads.
Disclaimer: The information contained herein has been compiled or arrived at, based upon information obtained in good faith from sources believed to be reliable. All such information and opinions can be subject to change. The image featured in this article is for representation purposes only and does not in any way represent the project. If you wish the article to be removed or edited, please email editor@biltrax.com.
Discover more from Biltrax Media, A Biltrax Group venture
Subscribe to get the latest posts sent to your email.